Projects & Contacts
No |
Contract No. |
Project |
Value |
1 |
123-2005 |
Lighting works of kraimya- Aljazaer farm road |
480,000.000 |
2 |
191-2005 |
Lighting works of agricultural road from 7April factory to Oum Alqura mosque |
480,000.000 |
3 |
Agreement protocol |
Demolition and disposing wastes to dumping area of buildings, yards, stores inside Al- Abyar army camp |
2,285,605.400 |
4 |
Agreement protocol |
Supplying Zamzam area with drinking water |
487,620.000 |
5 |
Agreement protocol |
Excavation works of water pipeline at Alwadi Alahmer |
348,300.000 |
6 |
Agreement protocol |
Destruction of buildings and preparing desalination plant location, cleaning and leveling of beach with 6 km long from 100 villas site |
450,397.500 |
7 |
Agreement protocol |
Demolition of building and removing obstacles at Ein Zara site |
806,343.950 |
8 |
Agreement protocol |
Demolition and dispose of wastes to dumping area, Sidi Alsaeh |
646,680.000 |
9 |
Agreement protocol |
Demolition of buildings and dispose of wastes to dumping area at northern Merg site |
396,912.000 |
10 |
Agreement protocol |
Supply of drinking water to Zamzam Alwadi AlAhmar, Alwadi Alahmer part |
492,780.000 |
11 |
176/2007 |
Demolition, removing, excavation, and dumping of wastes at Benghazi, Alabyar, Sloog and Darna |
6,859,955.000 |
12 |
W/0551/DD/07 |
Derj- wafa oil field road maintenance, ENI GAZ |
2,300,000.000 |
13 |
249/2007 |
Paving, concrete works and execution of infrastructure for 370 residential units at Darna |
28,860,000.000 |
14 |
23/2008 |
Paving, excavation and dumping of wastes for 370 residential units site at Darna, Alkashaf forest |
29,507940.000 |
15 |
188/2008 |
Execution of 250 residential units at Tamzawa/Wadi Alshaty |
28,900,000.000 |
16 |
19/01/2008 |
Execution of Nalut full infrastructure |
82,982,862.180 |
17 |
76/19 |
Supplying of 700 residential units at the African union complex with drinking water |
812,364.000 |
18 |
283/2008 |
Execution of 250 residential units, Sirt |
51,497,625.000 |
19 |
Agreement protocol 76/67 |
Excavation works of pipeline for supplying Bir Altierfas residential area with water, Tripoli |
2,580,000.00 |
20 |
G.C.M12/12/2009 |
Opening of right of ways & kerbstoneworks of roads at Ageeb 2, Alzaroog |
487,150.848 |
21 |
Agreement protocol 331/2009 |
Maintenance of Merj immigration building |
491,902.000 |
22 |
Agreement protocol 332/2009 |
Maintenance of Albaiyda immigration building |
250,376.000 |
23 |
Agreement protocol 353/2009 |
Maintenance of Darna immigration building |
262,852.000 |
24 |
C/0600/ME/08 |
Supply of equipment for Mellitah oil field site |
6,200,000.000 |
25 |
C/0601/WA/08 |
Supply of equipment for Wafa oil field site |
2,700,000.000 |
26 |
C/574/MA/08 |
Civil and electrical works for Air Quality Monitoring Stations at Mellitah |
144,750.000 |
27 |
Agreement protocol A/WW384 |
Demolition and removal of debris and execution fencing of 500 residential units at Benghazi medical center |
497,306.000 |
28 |
120/2009 |
Cleaning, leveling and wastes dumping at site surrounding the project of 100 hospitality villas, Sirt |
7,435,004.000 |
29 |
161/2009 |
Demolition of buildings and preparing desalination plant location, cleaning and leveling of beach with 6 km long from 100 villas site |
3,525,900.500 |
30 |
Agreement protocol 470/2009 |
Demolition of buildings opposite to Attahaddi University, Sirt |
433,166.000 |
31 |
Agreement protocol E/A/M/595 |
First phase of clean-up project, dispose of wastes and grassing of the square facing the houses of hospitality district, African Union, Sirt |
495,013.000 |
32 |
Agreement protocol E/A/W596 |
Second phase of clean-up project, dispose of wastes and grassing of the square facing the houses of hospitality district, African union, Sirt |
497,991.000 |
33 |
Agreement protocol E/A/M/651 |
Cleaning works, wastes dispose and grassing Of squares opposite to the houses of senior visitors, Sirt |
499,291.000 |
34 |
C/ 621/WA/09 |
Maintaining residential camp for Wafa oil field |
210,580,000 |
35 |
181/2009 |
Maintenance of students’ house of oil institute to be used instead students’ house inside Al- Batnan university compound |
3,599,949.500 |
36 |
182/2009 |
Supply of 100 residential units at Sirt with drinking water |
1,404,200.000 |
37 |
234/2009 |
Executing of utilities of 370 residential units at Kashaf forest, Darna |
5,554,240.000 |
38 |
235/2009 |
Demolition of 46 dilapidated multi floor buildings at Darna |
9,655,933.000 |
39 |
C/0644/WA/10 |
Sand removal and internal road maintenance at wafa oil field |
1,239,000.000 |
40 |
Work Order 3272 |
Executing metal fence along the two sides of the jointing road between Alsawawa intersection and Abu-Hadi roundabout |
2,575,422.250 |
41 |
Work Order 3273 |
Road expansion of jointing road between Alsawawa intersection and Abu-Hadi roundabout |
2,123,000.000 |
42 |
51/13/1-112009 |
Preparing and arranging of public dumping area at Tawarga |
485,786.726 |
43 |
244/2009 |
Execution of infrastructure for 1000 residential Units, Sirt |
60,107,000.000 |
44 |
245/2009 |
Execution of Service buildings at African union Quarter, Sirt |
25,311,627.438 |
45 |
256/2009 |
Execution of 500 residential units southern of Morah Road, Sirt |
102,995,250.000 |
46 |
Work Order |
Supply of equipment for MAN Ferrostaal Oil & Gas Ltd. at Wafa oil field |
404,500,250.000 |
47 |
Work Order |
Erecting residential camp for Dietsmann Maintaining Energy Co. at Wafa oil field |
90,000.000 |
48 |
Work Order 7363 |
Maintenance and furnishing of two buildings belongs to Africa village for hospitality, Sirt |
450,000.000 |
49 |
Work Order |
Maintenance and substitute of main sewage pipeline of 600 residential units, Sirt |
2,123,000.000 |